ANALYSIS OF IMPACT OF ERP PREDICTION ERROR TO
ASTRONOMICAL GEODESY
1)Institute of Navigation and Aerospace Target Engineering,Information Engineering University,Zhengzhou 450052
2)61081 Troops of PLA,Beijing 100094
Abstract The accuracy of 30 and 365 days prediction value of ERP were respectively analyzed,as well as their impact to astronomical geodesy were analyzed.Analysis results show that:the 365 days prediction values of polar motion and 30 days prediction values of length of day(LOD)could be used in astronomical longitude and latitude measurement,and 365 days prediction values of ERP could be used in astronomical azimuth measurement.
Key words :
Earth Rotation Parameter(ERP)
polar motion;length of day
astronomical longitude and astronomical latitude
astronomical azimuth
Received: 28 August 2013
Published: 21 April 2014
Cite this article:
Li Chonghui,Zheng Yong,Zhang Chao et al. ANALYSIS OF IMPACT OF ERP PREDICTION ERROR TO
ASTRONOMICAL GEODESY[J]. jgg, 2014, 34(2): 132-136.
Li Chonghui,Zheng Yong,Zhang Chao et al. ANALYSIS OF IMPACT OF ERP PREDICTION ERROR TO
ASTRONOMICAL GEODESY[J]. jgg, 2014, 34(2): 132-136.
URL:
http://www.jgg09.com/EN/ OR http://www.jgg09.com/EN/Y2014/V34/I2/132
[1]
DONG Qijia,CHENG Yan,ZHOU Zhonghua,XU Song,QING Yun,WANG Wenjun. Analysis of ITRS to J2000 Coordinate System Conversion Error and Its Influence on Occultation Inversion [J]. jgg, 2021, 41(5): 530-534.
[2]
QIAN Wei,YUE Jianping,SHAN Lijie,HAN Chenyu. Accuracy Analysis of Solving Earth Rotation Parameters Based on VLBI Observation Data [J]. jgg, 2021, 41(12): 1245-1248.
[3]
ZHANG Xinxin,WANG Lei,XU Beizhen,LI Tao,CHEN Ruizhi. The Impact of ERP Prediction Error on LEO Precise Orbit Prediction [J]. jgg, 2020, 40(5): 482-485.
[4]
ZHANG Xinfeng,LIU Genyou. Extraction of Interannual Signals in the Length-of-Day Variation and Correlation Analysis with the Atmosphere [J]. jgg, 2020, 40(11): 1188-1193.
[5]
WANG Zhiwen,WANG Qianxin,HE Yilei,HU Chao. A New Method to Predict Pole Shift Based on the Correlation Between PMX and PMY [J]. jgg, 2017, 37(11): 1178-1182.
[6]
PENG Youzhi,HE Wei,LI Ji,LIU Haibo. A Gyrotheodolite Calibration Device Based on Astronomical Geodetic Surveying on the Baseline Field [J]. jgg, 2016, 36(4): 327-320.
[7]
WANG Xinjing,YUAN Yunbin,TAN Bingfeng,SONG Min,LIU Teng. Estimation of the ERPs Based on GPS Data and the Analysis of the Impact Factor [J]. jgg, 2016, 36(10): 902-906.
[8]
CHEN Lue,TANG Geshi,XU Xueqing,HU Songjie,SUN Jing,LIU Ye. Research on High Accuracy Dual Differential LS+AR Method
in Earth Polar Motion Parameters Prediction [J]. jgg, 2015, 35(5): 844-848.
[9]
Wei Erhu,Li Zhiqiang,Yin Zhixiang. RELATIONSHIP BETWEEN CHANGE OF EARTH ROTATION
RATE AND EARTHQUAKES [J]. jgg, 2014, 34(1): 1-3.
[10]
Sun Zhangzhen, Xu Tianhe. INFLUENCE ON SHORT-TERM PREDICTION ACCURACY OF POLAR
MOTION BY EI Nio EVENT [J]. jgg, 2013, 33(5): 16-20.
[11]
Sun Zhangzhen,Xu Tianhe. PREDICTION OF LENGTH OF DAY BASED ON LS+AR MODEL AND
ACCURACY ANALYSIS OF DIFFERENT CYCLE TERM [J]. jgg, 2013, 33(4): 69-72.
[12]
Wang Yupu;and Lü Zhiping. RESEARCH ON ALGORITH OF WAVELET NEURAL NETWORK FOR FORECASTING LENGTH OF DAY [J]. , 2012, 32(1): 127-131.
[13]
Zhang Hao;Wang Qijie;Zhu Jianjun;and Zhang Xiaohong. APPLICATION OF COMBINATIONAL MODEL OF LEAST SQUARES EXTRAPOLATION AND ARIMA(P,1,0) IN SHORT-TERM PREDICTION OF POLAR MOTION [J]. , 2011, 31(3): 106-109.
[14]
Xu Junyi;. GM(1,1)MODEL BASED ON INTERCEPT CORRECTION AND
APPLICATION TO POLAR MOTION PREDICTION [J]. , 2010, 30(1): 88-91.
[15]
Chen Wei;Shen Wenbin;Li Jin ;and Han Jiancheng . VARIATIONS OF LOD INFERRED FROM TEMPORAL GRACE GRAVITY DATA [J]. , 2009, 29(3): 119-124.