Abstract:In this paper, on the basis of cross-fault flow deformation layout monitoring and geological structure research results collected on north China, the layout monitoring time and monitoring cycle, the cross-fracture characteristics of monitoring sites, monitoring sites distributing area, type of monitoring sites and measuring pile type are analyzed. The results show that the layout monitoring situation of different monitoring units varies considerably, that layout measuring time and monitoring cycle are not uniform, that there is a monitoring blind area, that cross-fracture activities corresponding with regulatory requirements are lower, and that most monitoring sites require only standard monitoring.
LU Mingyong,LI Ning,YU Haisheng et al. Preliminary Analysis of the Layout Monitoring Situation
of Cross-Fault Flow Deformation in North China[J]. jgg, 2015, 35(6): 979-983.